3D Fabrication Model & Shop Drawing, Samcheok Breakwater
고객사 : Dongbu E&C
계약기간 : 2011-07
This project of the Dongbu E&C 1800m breakwater is construction site. 72 typical types of caisson were 3d reinforced modeling:
Comparing BIM with 2D based design. /Review of constructability. /Detecting
the errors of 2D based design. /Review the adequacy of quantity.