BIM, Construction of The western sea's railway (Hongseong~Songsan) Double Track Railway. 5
고객사 : Daelim
계약기간 : 2013-05
Taesung S&I made a BIM based design from existing 2D based design. DMU about pier and superstructure is performed and compared with 2D based reinforcement drawings. The purposes of this project are as follows:
DMU (Digital Mock-Up) about typical segment of Pylon. /Comparing BIM with 2D based design.
Crash Detective between Structures.
Taesung S&I made 3D BIM about whole structures. Especially, DMU about one pier and one superstructure proceeded with 3D reinforcement program. Exact amount of reinforcement and detailed shape were reviewed.