포트폴리오

포트폴리오

BIM, DESIGN & CONSTRUCTION OF CP07-B LUSAIL TOWERS INFRASTRUCTURE, LRT STATION, CAR PARK AND LANDSCAPE (Tender)

고객사 : SAMSUNG C&T - Qatar Building Company JV

계약기간 : 2017-04

BIM’s information model of Structure and Infra structure are made of existing 2D based drawings. Also, 3D model objects were linked with processes linkage. Then the BIM based design was compared with the 2D based design. The purposes of this project were as follows;

 

-  Comparing BIM with 2D based drawings.

-  Review of 3D model objects and processes linkages

-  Crash Detected between Structures
-  Check Earthworks and Structures

 

3D BIM was used to check the construction sequence considering the processes linkages.