Honam High-speed Railway depot / 호남고속철도차량기지 건설공사중 3차원 가상검토기법(BIM)구축용역

고객사 : Daelim

계약기간 : 2013-08

 

BIM’s information model of Arch Bridge made from existing 2D based drawings. Also, 3D model objects were linked with processes linkage. Then BIM based design compared with 2D based design. The purposes of this project are as follows:


Consulting of proper type of Bridge. Review of 3D model objects and processes linkages.

Review of Safety measure and facilities.  Crash Detective between Structures.


3D BIM was used to check the construction sequence considering the processes linkages. Also, a safety measure plan was reviewed.