Building BIM based reinforcement management system

고객사 : Hyundai E&C

계약기간 : 2013-04

 

Taesung S&I made a BIM based design from existing 2D based drawings. Then DMU about typical Box-type and Abutment are performed and compared with 2D based reinforcement drawings. Based on the results of this process and deliverables production, we get the following purposes:


DMU (Digital Mock-Up) about typical Box-type and Abutment. / Comparing BIM with 2D based design. / Comparing amount of reinforcement between BIM and 2D drawings.


Crash Detective between reinforcement.