Construction of Sandaldo bridge / 산달도 연륙교 가설공사 실시설계용역
고객사 : Lotte E&C
계약기간 : 2013-04
Taesung SNI made a BIM based design from existing 2D based drawings. Then DMU about typical segment of pylon is performed and compared with 2D based reinforcement drawings. The purposes of this project are as follows:
DMU (Digital Mock-Up) about typical segment of Pylon. Comparing BIM with 2D based design.
Crash Detective between Structures.
Taesung S&I made 3D BIM about whole structures. Especially, DMU about one pier proceeded with 3D reinforcement program. Exact amount of reinforcement and detailed shape were reviewed.