Building BIM based construction management system, Offshore Wind force's Monopile

고객사 : Posco E&C

계약기간 : 2014-04

For the development of offshore wind power generation system of the monopile type, to build a 3d virtual evaluation system based on BIM, we examined the construction plan validity and facility planning refinement:


Completion of detailed Construction Time Schedule. Review of Safety Measure.


Proper Estimation of Equipment Capacity for installation. Comparing 3D BIM with 2D based design.


3D BIM was used to check the safety measure considering the processes linkages and make the detailed construction time schedule. Also, proper equipment capacity was estimated from 3D BIM equipment simulation.