BIM, Songdo Central Park's Pedestrian Cable Stayed Bridge, South Korea
고객사 : Posco E&C
계약기간 : 2012-05
BIM’s information model was applied to the Cable-Stayed bridge. Taesung SNI made a BIM based design from existing 2D based design. The purposes of this project are as follows:
Review of Construction Design. /Comparing BIM with 2D based design. /Detecting
the errors of 2D based design. /Quantity Estimation of the Construction materials.
/Extraction of Drawings from BIM’s information model.
3D BIM was used to make the proposal about the bridge. Also, quantity estimation was performed.