Virtual Construction, Nakdong River See Dike Sluice
고객사 : Samsung C&T
계약기간 : 2011-11
Taesung SNI made an equipment simulation. Considering the possible construction operation plan by building the 3d equipment operation system for shortening of construction time: Proper Estimation of Equipment Capacity for installation. /Review of Safety Measure.
Comparing 3D BIM with 2D based design.
3D BIM equipment simulation was used to check the safety measure and estimate the proper equipment capacity.